Maharashtra
Navi Mumbai: No water supply in Ulwe due to repair work
There is no water supply in the newly developed nod Ulwe on Saturday as the City and Industrial Development Corporation (CIDCO) has taken repair and maintenance work on the 800 mm feeder main line for Ulwe.
The 24-hour shutdown began on Saturday (May 20) morning and the water supply is likely to resume early on Sunday. However, the water supply will be supplied with low pressure. Meanwhile, CIDCO has appealed to store water and use it judiciously.
Navi Mumbai saves water
It seems like the region might be prepared for the water cut as it was earlier reported that it saves water by recycling it. News Agency stated in a report earlier this month that the Navi Mumbai Municipal Corporation (NMMC) is saving around 25 MLD water (millions of liter per day) by rationing the water supply in the city.
Furthermore, the civic body claimed that water saved from half-day water cuts once a week in every ward will help to meet the water supply in days to come.
Morbe Dam has adequate water to meet demands till August 2023
During the last monsoon, the catchment area of Morbe dam received a total of 3573 mm rainfall and the dam was not overflown. This made the water resource get equipped with enough water for its people.
An official from NMMC’s Water Supply pointed out that the dam has adequate water to meet the demand till August 9, and said: “Around 480 MLD of water is withdrawn from the dam daily to supply water to the citizens of the city. Apart from the city, NMMC has to supply water to 7 villages in the Morbe area and Kamothe in the CIDCO area. NMMC area gets around 409 MLD water daily while the remaining goes to other areas.”
Maharashtra
Mumbai: Accused wanted in Kurla Methi River irregularities arrested, accused of cheating crores of rupees and creating fake AMU

Mumbai: Economic Wing AOW has claimed to have arrested the wanted accused and contractor in the case of Mithi Nadi cleanliness and irregularities. The AOW has arrested the absconding wanted Sunil Shyam Narayan SM Infrastructure, Mahesh Madhav Rao Purohit. During the investigation of the Mithi Nadi contract and irregularities worth crores of rupees, the police had registered a case. Earlier, three accused were arrested. According to the EOW, from 2013 to 2023, fake MAUs were prepared and bills worth crores of rupees were approved in collusion with BMC officers. A proposal to purchase a machine to remove garbage from 2021 to 2024 was also approved and under the guise of the same, a fraud of crores of rupees was committed for cleaning the garbage. In this case, the police have arrested the accused agents Ketan Kadam, Jay Joshi and Mithi Nadi contractor Sher Singh Rathore. By preparing fake documents, the accused also prepared fake AMUs and also signed fake signatures. The accused were produced in court and remanded in custody until December 16.
Maharashtra
ED, ATS Conduct Raids Across Maharashtra & Delhi Over Suspected Terror-Funding

Mumbai: The Enforcement Directorate (ED) on Thursday carried out a coordinated search operation in Borivali village near Padgha in Thane district, with assistance from the Maharashtra Anti-Terrorism Squad (ATS), officials said.
The operation, which began in the early hours of Thursday, extended to multiple residential premises as ED officials probed suspected terror funding and related financial transactions. ATS personnel provided on-ground support to coordinate the ED searches.
According to ED officials, the searches were conducted at nearly 40 locations across Maharashtra including Padgha, Pune, and Malegaon as well as in Delhi. The searches are linked to suspected financial transactions associated with terror-related activities.
The ED had recently registered an ECIR linked to the NIA’s ISIS terror module case involving Saquib Nachan, as well as the Pune ISIS module case. While ATS is simultaneously investigating the same modules, it is assisting the ED by sharing intelligence, leads, and field updates, helping ensure that the ongoing search operations are thorough, coordinated, and synchronised.
Officials said the operation is ongoing, with teams continuing to probe the suspected financial networks connected to the terror modules.
Maharashtra
Raj Thackeray Appears Before Thane Court, Denies Guilt In 2008 Railway Assault Case

MNS chief Raj Thackeray appeared before the Thane Railway Court on Thursday for a hearing linked to the 2008 railway recruitment violence at Kalyan station. The incident involved MNS workers assaulting North Indian candidates who had arrived for recruitment exams, leading to disruption and damage to railway property. A case was registered against Thackeray and several party workers soon after.
During the brief hearing, the judge asked Thackeray whether he confessed to the charges. Thackeray replied that he did not admit guilt. The judge noted that the matter could be concluded within a month and asked for full cooperation from all accused. Thackeray agreed to comply.
Speaking after the hearing, Thackeray’s lawyer Omkar Rajurkar said the next date has not been decided yet and will be issued later. He added that Thackeray does not need to appear again in person unless directed. Rajurkar confirmed that the court asked whether the accused admitted to the crime, and Thackeray stated clearly that he did not. The judge reiterated that cooperation was expected as the case nears completion.
Rajurkar stressed that Thackeray would continue to cooperate fully with the proceedings.
The case dates back to 2008, when MNS workers allegedly targeted North Indian candidates at Kalyan station during a railway recruitment drive. The attackers argued that migrant job seekers were taking opportunities meant for local youth. Following the violence, a case was filed against Raj Thackeray and seven MNS workers, all of whom were arrested but later released.
Originally heard in the Kalyan Court, the matter was later shifted to the Thane Railway Court. Due to repeated absence of the accused at earlier hearings, the court had issued an arrest warrant, which was later cancelled after an application by Thackeray’s legal team.
With the court indicating that the case could conclude within a month, the matter now moves towards its final phase.
-
Crime3 years agoClass 10 student jumps to death in Jaipur
-
Maharashtra1 year agoMumbai Local Train Update: Central Railway’s New Timetable Comes Into Effect; Check Full List Of Revised Timings & Stations
-
Maharashtra1 year agoMumbai To Go Toll-Free Tonight! Maharashtra Govt Announces Complete Toll Waiver For Light Motor Vehicles At All 5 Entry Points Of City
-
Maharashtra1 year agoFalse photo of Imtiaz Jaleel’s rally, exposing the fooling conspiracy
-
National News1 year agoMinistry of Railways rolls out Special Drive 4.0 with focus on digitisation, cleanliness, inclusiveness and grievance redressal
-
Maharashtra1 year agoMaharashtra Elections 2024: Mumbai Metro & BEST Services Extended Till Midnight On Voting Day
-
National News1 year agoJ&K: 4 Jawans Killed, 28 Injured After Bus Carrying BSF Personnel For Poll Duty Falls Into Gorge In Budgam; Terrifying Visuals Surface
-
Crime1 year agoBaba Siddique Murder: Mumbai Police Unable To Get Lawrence Bishnoi Custody Due To Home Ministry Order, Says Report
