Connect with us
Wednesday,25-November-2026
Breaking News

Maharashtra

Sanjay Raut accuses Maha Minister of demanding Rs 5 crore bribe

Published

on

A major political controversy has erupted in Maharashtra after Shiv Sena (UBT) MP Sanjay Raut on Wednesday accused Social Justice Minister Sanjay Shirsat of demanding a Rs 5 crore bribe to clear a Rs 25 crore proposal for a training centre in Latur.

However, Minister Shirsat has strongly refuted the allegations, launching a sharp counter-attack against Raut and the Thackeray faction.

Addressing a press conference during his visit to Chhatrapati Sambhajinagar, Raut levelled serious corruption charges against Minister Sanjay Shirsat and Chief Minister Devendra Fadnavis’s government, following up with posts on social media.

According to Raut, Narsing Udgirkar, a social activist and leader from the Matang community in Latur, met him and shared his ordeal. Udgirkar had submitted a complete Rs 25 crore proposal to establish a training centre named after Lokshahir Annabhau Sathe in Latur to provide competitive exam coaching and educational programs for Dalit and Matang youth.

Despite fulfilling all documentation requirements, Udgirkar’s file was allegedly stalled. Raut claimed that Officer on Special Duty (OSD) Siddharth Bhandari told Udgirkar the work would not proceed without meeting the minister. When Udgirkar met Minister Shirsat face-to-face, the minister allegedly demanded Rs 5 crore in exchange for clearing the Rs 25 crore project.

When Udgirkar pleaded that he was working for the upliftment of Dalits and could not afford such a massive sum—offering only a small amount—Minister Shirsat allegedly refused to approve the proposal, which remains pending. Raut challenged authorities to summon Udgirkar and verify the facts.

Minister Shirsat held a press conference to dismiss the charges as baseless and politically motivated, turning the tables on the Thackeray faction. Minister Shirsat challenged Raut to show proof of even a single Rs 25 crore proposal approved by him in the last two years.

He clarified that as a minister, he does not have the authority to approve proposals exceeding Rs 10 crore, as such projects require the Chief Minister’s permission.

Hitting back at the Shiv Sena (UBT), the minister questioned the integrity of the previous Maha Vikas Aghadi (MVA) government.

“What was the backdoor of Matoshree for? Why were tempos used to enter through that backdoor?” he asked, alleging corruption during Uddhav Thackeray’s tenure.

He accused Thackeray of sidelining loyalists without money in favour of wealthy leaders and independents like Shankarrao Gadakh, Anil Parab, and Subhash Desai.

Minister Shirsat challenged Raut and Uddhav Thackeray to name a single Dalit or Buddhist cabinet minister appointed by them during their 1995 or 2019–2022 stints in power.

He alleged that he was denied a ministerial berth earlier because of his caste and lack of financial clout, and claimed Raut was now targeting him to force his resignation.

Accusing Raut of using Annabhau Sathe’s name merely for political mileage, Minister Shirsat asked if Uddhav Thackeray had ever even garlanded a photo of Sathe.

Listing his own initiatives, he highlighted Rs 50 crore sanctioned for a grand statue and a 5-acre memorial for Annabhau Sathe in Wategaon, Rs 90 crore allocated for the beautification of Chavdar Tale in Mahad and Rs 1,200 crore earmarked for Dalit student hostels and Rs 14.5 crore for Wamandada Kardak’s memorial.

Further, Minister Shirsat said his ministry is involved in securing 10 acres of land in Bodh Gaya after directly coordinating with the Chief Minister.

Concluding his press conference, he questioned the background of the complainant, Narsing Udgirkar, and issued a stern warning that he would take strict action against anyone attempting to blackmail or defame him.

Business

CBI conducts searches in NHB fraud case linked to Star Housing Finance

Published

on

The Central Bureau of Investigation (CBI) has conducted searches at six locations in Udaipur and Mumbai in connection with an alleged bank fraud case involving M/s Star Housing Finance Ltd. and its directors, officials said on Wednesday.

The National Housing Bank (NHB) is alleged to have suffered a wrongful loss of Rs 80.15 crore.

According to a CBI statement, the agency carried out searches at the premises of the company’s directors and other associated persons as part of its ongoing investigation into the alleged financial irregularities.

The case was registered following a written complaint lodged by the National Housing Bank against M/s Star Housing Finance Ltd., its directors, and unknown public servants. The accused have been booked for offences including criminal conspiracy, cheating, criminal breach of trust, falsification of accounts, and criminal misconduct.

Investigators alleged that the housing finance company siphoned off funds by disbursing a number of fictitious or “phantom” loans. These loans were allegedly shown as genuine lending transactions, enabling the diversion of funds and resulting in a substantial financial loss to NHB.

The searches led to the recovery of several documents and other materials that the agency believes could be relevant to establishing the flow of funds and identifying the individuals responsible for the alleged fraud. The seized records are being examined as part of the investigation.

The CBI said further investigation is underway to ascertain the extent of the alleged diversion of funds, identify any additional beneficiaries, and determine whether any public officials played a role in facilitating the fraud.

The action comes amid the agency’s continued crackdown on financial crimes and corruption in the banking sector.

Last week, the CBI arrested a bank manager in Dehradun along with two alleged accomplices in a separate case involving the alleged demand and acceptance of a bribe for sanctioning a bank loan worth Rs 1.80 crore.

Continue Reading

Maharashtra

After Social Media Controversy, Mumbai Mayor Ritu Rajesh Tawde Issues Clarification

Published

on

Following a cowardly attack on a young couple at Pramod Mahajan Park in Kurla (West), Mumbai, a single sentence from my statement has been taken out of context and deliberately distorted on social media. From the very beginning, my firm stance has been that strict legal action must be taken against those responsible for this attack. Mumbai Mayor Ritu Rajesh Tawde has clarified that confusion is being intentionally created through the misinterpretation of incomplete video clips—a narrative that falsely suggests the victims themselves are being held at fault. Regarding the incident at Kurla Park, Mayor Ritu Tawde—speaking to the media on November 21, 2026—had strongly condemned the attack on the young couple and the criminal act itself. The Mayor made it clear that those who take the law into their own hands will, under no circumstances, be shielded or protected. Meanwhile, the police have taken swift action, apprehending the minors involved in the crime and sending them to a juvenile detention center. Clarifying that her remarks regarding the incident had been distorted, the Mayor stated, “While speaking to the media about the incident at Currey Road Garden—after the journalists had finished asking their specific questions—I was asked a general question. A reporter posed this in the context of the occasional unpleasant incidents that occur in Mumbai’s parks. In response, I clearly stated that there is nothing wrong with citizens visiting and sitting in these gardens. Municipal parks are for everyone—senior citizens, mothers with young children, youth, and, in fact, every segment of Mumbai’s population. With the broader objective of ensuring a safe and dignified environment for all, I made a general appeal—applicable to everyone—that people should observe the decorum and discipline of public spaces and demonstrate good conduct. My response was by no means directed at the young couple involved in this specific incident, nor did I have any intention to assign blame or interfere with anyone’s personal freedom; such a notion does not even arise. However, the original context of my statement was omitted, creating a false impression that is now being deliberately propagated,” explained Mayor Ritu Tawde.

The safety of citizens is being prioritized in all public parks across Mumbai. The administration has been directed to further tighten security arrangements and increase patrols to curb the activities of anti-social elements. Mayor Ritu Rajesh Taure has further appealed to the public to consider all the facts of the situation, rather than spreading misconceptions based on incomplete information.

Continue Reading

Maharashtra

Inspection of the Mumbai Coastal Road (North) project site: Visit by Additional Municipal Commissioner (Projects) Abhijit Bangar

Published

on

Additional Municipal Commissioner (Projects) Abhijit Bangar visited the project site yesterday to review the progress of the Mumbai Coastal Road (North) project. This initiative is set to provide a new direction for Mumbai’s transport system, making travel to and from the western suburbs faster and more convenient. The significant project—which connects Versova to Bhayandar via a coastal road—is being executed across seven packages: A, B, C, D, E, F, and the Dahisar-Bhayandar Link Road (DBLR).

Under Package A, Bangar inspected the work at Amarnath Tower, near Kothe Bay. He directed that the number of machines on-site be increased to accelerate the pace of work. Furthermore, he instructed that the construction of a temporary access road and a temporary bridge (positioned at a right angle) be carried out concurrently to ensure rapid progress.

At the Lokhandwala Interchange, the actual piling work for the bridge has commenced. In addition to the bridge piling, a high-tension power line belonging to Adani Power must be relocated. Bangar ordered that the piling work for this relocation begin immediately, with a mandate for completion within 100 days, allowing for the timely shifting of the high-tension line and the subsequent commencement of the main bridge construction. Additionally, Bangar conducted a thorough inspection of the Mindspace Malad Interchange (under Package B), where a temporary access bridge (TAB) spanning approximately 4,000 meters is to be constructed. It must be ensured that the Tunnel Boring Machines (TBMs) are deployed here in parallel across seven alignments. Furthermore, it was directed that the rate of tunneling progress must, under no circumstances, be less than two meters per day.

Under ‘Package C’, a retrieval shaft will be constructed on land belonging to Raheja. Bangar inspected the site today and instructed officials to commence piling work immediately. Similarly, the launching shaft at Charkop was also inspected; excavation is currently underway there, with approximately ten meters already completed. At present, excavation at this location is proceeding at a rate of 1,350 cubic meters per day.

The plan entails completing the work on this shaft by March 31, 2027, assembling the Tunnel Boring Machine (TBM) starting April 1, 2027, and commencing actual excavation for the first tunnel on May 31, 2027. Subsequently, two months later—on July 31, 2027—excavation for the second tunnel will begin. It is anticipated that the first TBM will reach the retrieval shaft in Malad by July 2027. Bangar directed that the work be planned and executed in such a manner that the retrieval shaft in Malad is completed by that time.

Continue Reading

Trending