Connect with us
Wednesday,19-August-2026
Breaking News

National News

PM Modi doing nothing over ‘targetting’ of Muslims: Mehbooba Mufti

Published

on

Former Jammu and Kashmir Chief Minister Mehbooba Mufti on Monday said Prime Minister Narendra Modi is doing nothing over the alleged targetting of Muslims in some parts of the country.

She said this while talking to reporters in Srinagar, over PM Modi’s visit to Jammu and Kashmir.

The Prime Minister was in Pali village of Samba in Jammu on Sunday where he participated in the celebration of the National Panchayati Raj Day and addressed ‘Gram Sabhas’ across the country.

In his address, the Prime Minister said that the youth will not see the miseries that their parents and grandparents have seen in the past.

Mehbooba Mufti said India is a secular country but the largest minority of the country “is being bulldozed, their houses and livelihoods are being bulldozed.”

“Jammu and Kashmir despite being a Muslim majority state joined a secular country where people belonging to all religions live together, but that is not the case now. Muslims are feeling low now,” she said.

She asked who are the youngsters that the Prime Minister was talking to, “those that have been slapped with UAPA as if the PSA was less severe?”

“There is no future for youth of Jammu and Kashmir. Jobs are going out. Our mineral resources, liquor shops of Jammu are handed to outsiders. Our land is on sale. The stamp duty has been slashed by 50 per cent so that the land gets plundered,” she said.

“Jammu and Kashmir that gives electricity to the entire country has been plunged in darkness, even during the month of Ramzan there is no electricity,” she added.

Business

New multi-tracking projects to boost rail infrastructure across 4 states: PM Modi

Published

on

New Delhi, Aug 19: Prime Minister Narendra Modi said on Wednesday that four multi-tracking projects that have been approved by the Cabinet will provide a major boost to railway infrastructure and connectivity across Andhra Pradesh, Odisha, Tamil Nadu and West Bengal.

These projects will have many benefits, like strengthening passenger and freight movement, reducing congestion and greater logistics efficiency. The better connectivity will also facilitate commerce and tourism in these states, PM Modi said in a post on X.

The multi-tracking projects will add important capacity to the Indian Railways network and benefit lakhs of people, he added.

The projects, which entail a total investment of Rs 9,450 crore, will be completed by 2030-31.

The projects include the Kharagpur – Bhadrak (Ranital) 4th Line across a stretch of 173 km covering West Bengal and Odisha; the second project is a 4th line from Bhadrak to Haridaspur across 75 km in Odisha, while the third is the Gummidipundi – Gudur 3rd and 4th line extending across a distance of 90 km in Andhra Pradesh and Tamil Nadu. The fourth project is the Cuttack to Paradeep (Badabandha) 3rd and 4th lines to cover a 72 km route in Odisha.

The projects are in line with the Prime Minister’s vision of a New India, which will make people of the region “Atmanirbhar” by way of comprehensive development in the area, which will enhance employment opportunities, a statement said.

The projects are planned on the PM-Gati Shakti National Master Plan with a focus on enhancing multi-modal connectivity and logistics efficiency through integrated planning and stakeholder consultations. These projects will provide seamless connectivity for movement of people, goods and services.

The four projects covering eight districts across West Bengal, Odisha, Tamil Nadu and Andhra Pradesh will increase the existing network of Indian Railways by about 410 kms. The proposed multi-tracking projects will enhance connectivity to approximately 6,448 villages with a population of about 60 lakhs.

The proposed capacity enhancement will improve rail connectivity to several prominent tourist destinations across the country, including Kuldiha Wildlife Sanctuary, Bhitarkanika National Park, Maa Bhadrakali temple, Maa Dhamarai temple, Panchalingeswar Temple, Talsari–Udaypur and Chandipur Beach, Pulicat Lake, Nelapattu Bird Sanctuary, Lord Veeraraghava Perumal Temple, Gada Kujanga Jagannath Temple, Sarala Temple, Dhabaleswar Temple and Lalitgiri, a Buddhist site.

The proposed projects are essential routes for transportation of commodities such as coal, iron ore, cement, iron and steel, containers, automobiles and food grains.

Continue Reading

Business

Cabinet okays key Bihar road project for Rs 3,590 crore to boost connectivity, cut congestion

Published

on

New Delhi, Aug 19: In a bid to expand Bihar’s National Highway network and facilitate faster movement of goods and passengers, the Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, on Wednesday approved the upgradation of an 82.578 km length of the Muzaffarpur-Sitamarhi-Sonbarsa Section of NH-22 to four-lane, at a total capital cost of Rs 3,590.73 crore.

The project acts as a key feeder corridor connecting the India–Nepal border at Sonbarsa with economic centres like Muzaffarpur at NH-27 (East–West Corridor).

According to the Cabinet, this will significantly reduce congestion in densely populated areas of Muzaffarpur, Muksudpur, Runni Saidpur, Thumma, Dumra, Bhutahi, and Sonbarsa.

“The Muzaffarpur–Sitamarhi–Sonbarsa stretch of NH-22 holds significant strategic and economic relevance, ensuring seamless linkage to the national freight grid,” a Cabinet communique said.

It not only enhances connectivity to industrial zones like Barauni and riverine logistics hubs but also strengthens cross-border passenger and cargo movement via the nearby Land Port at Bhithamore.

Additionally, the upgraded corridor will enhance connectivity to five PM Gati-Shakti Economic Nodes (four Industrial Estates and one Mega Food Park), four Social Nodes (Baba Garibnath Temple, Mata Janki Temple, Punaura Dham, Muzaffarpur and Sitamarhi aspirational Districts), and two Logistic Nodes (Muzaffarpur and Sitamarhi Railway Stations).

Improved connectivity will facilitate efficient movement of goods and agricultural supply chains, support regional economic growth, and provide better access to important cultural and religious destinations such as the Buddhist Circuit and historic Janaki Punaura Dham Temple, Sitamarhi.

According to the Cabinet, the project has been designed for a speed of 100 kmph with an average speed of 80 kmph, having no at-grade median openings, ensuring fast and safe travel.

Moreover, the project has provision for seven major bridges (including a 340-metre-long major bridge over the perennial Bagmati River), three Railway Over Bridges (ROBs), and two flyovers to maintain cross movement of the traffic and ensure safe, high-speed travel.

Continue Reading

Business

Cabinet okays 4 railway projects worth Rs 9,450 crore

Published

on

New Delhi, Aug 19: The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, on Wednesday approved four multi-tracking railway projects with a total investment of Rs 9,450 crore, which will be completed by 2030-31.

The projects include the Kharagpur-Bhadrak (Ranital) 4th Line across a stretch of 173 km covering West Bengal and Odisha; the second project is a 4th line from Bhadrak to Haridaspur across 75 km in Odisha, while the third is the Gummidipundi-Gudur 3rd and 4th line extending across a distance of 90 km in Andhra Pradesh and Tamil Nadu, a Cabinet communique said.

The fourth project is the Cuttack to Paradeep (Badabandha) 3rd and 4th lines to cover a 72 km route in Odisha.

The increased line capacity will significantly enhance mobility, resulting in improved operational efficiency and service reliability for Indian Railways. These multi-tracking proposals are poised to streamline operations and alleviate congestion. The projects are in line with the Prime Minister’s vision of a New India, which will make people of the region “Atmanirbhar” by way of comprehensive development in the area, which will enhance employment opportunities, the statement said.

The projects are planned on the PM-Gati Shakti National Master Plan with a focus on enhancing multi-modal connectivity and logistics efficiency through integrated planning and stakeholder consultations. These projects will provide seamless connectivity for movement of people, goods, and services.

The four projects covering eight districts across West Bengal, Odisha, Tamil Nadu and Andhra Pradesh will increase the existing network of Indian Railways by about 410 km. The proposed multi-tracking projects will enhance connectivity to approximately 6,448 villages with a population of about 60 lakh, the statement said.

The proposed capacity enhancement will improve rail connectivity to several prominent tourist destinations across the country, including the Kuldiha Wildlife Sanctuary, Bhitarkanika National Park, Maa Bhadrakali temple, Maa Dhamarai temple, Panchalingeswar Temple, Talsari–Udaypur and Chandipur Beach, Pulicat Lake, Nelapattu Bird Sanctuary, Lord Veeraraghava Perumal Temple, Gada Kujanga Jagannath Temple, Sarala Temple, Dhabaleswar Temple and Lalitgiri, a Buddhist site.

The proposed projects are essential routes for transportation of commodities such as coal, iron ore, cement, iron and steel, containers, automobiles, food grains, etc. The capacity augmentation works will result in additional freight traffic of magnitude 76 MTPA (Million Tonnes Per Annum). The Railways, being an environment-friendly and energy-efficient mode of transportation, will help both in achieving climate goals and minimising logistics cost of the country, reduce oil import ( around 13 crore litres) and lower CO2 emissions (around 65 crore kg), which is equivalent to the plantation of 2.60 crore trees, the statement added.

Continue Reading

Trending