Connect with us
Monday,19-October-2026
Breaking News

disaster

Nepali and Chinese nationals rescued alive from flood-hit areas

Published

on

Kathmandu, Sep 5: A Nepali woman and a Chinese national were rescued alive from two separate flood-affected areas on Saturday, 11 days after deadly floods struck areas along the Bhotekoshi and Trishuli river corridors in Nepal, the Prime Minister’s Office (PMO) said.

A 64-year-old woman, Chandrika Shrestha, was rescued on Saturday from the house of Anand Shrestha in flood-affected Betrawati Bazaar in Nuwakot district.

Shrestha, a resident of Bidur Municipality-10 in Nuwakot, was rescued by a team of the Armed Police Force, Nepal, led by Inspector Suman Bik. She was found unconscious, the PMO said.

Following the rescue, she was taken by helicopter to the Nepali Army’s Maithili Barracks in Trishuli. After receiving initial treatment, she will be taken to Kathmandu for further medical care, if necessary, the PMO said.

Meanwhile, a Chinese national was rescued from a tunnel of the flood-affected 216-MW Upper Trishuli 1 Hydropower Project in Rasuwa district, 11 days after the deadly floods struck the area.

The Nepali Army, in coordination with a disaster expert team from South Korea, rescued the Chinese national from Audit 4 of the project’s tunnel, the PMO said in a social media post.

The survivor was subsequently taken to the Maithili Barracks in Trishuli, Nuwakot, for further medical assessment and care.

The rescue was part of intensified ongoing efforts to locate and evacuate people believed to be trapped inside hydropower project tunnels following devastating floods that swept through the Bhotekoshi and Trishuli river systems last week.

Several hydropower projects and other infrastructure along the Bhotekoshi and Trishuli river corridors were badly damaged, while several workers employed at hydropower projects in the affected areas remain out of contact.

According to the Independent Power Producers’ Association, Nepal (IPPAN), a representative body of private-sector power developers in Nepal, the under-construction Upper Trishuli 1 Hydropower Project has reported the highest number of people out of contact among 11 flood-affected hydropower projects in the Rasuwa and Nuwakot districts.

As many as 936 people employed at 11 hydropower projects remain out of contact, including 551 from the Upper Trishuli 1 project, IPPAN said on Friday evening.

On Friday, the Nepali Army rescued two Nepali nationals alive after they had been trapped inside the tunnel of the 60-MW Upper Trishuli 3A Hydropower Project in Nuwakot district.

The Nepali Army has been conducting search and rescue operations in coordination with foreign technical teams, including experts from India, China and South Korea, to reach people stranded inside underground structures at several hydropower projects.

disaster

CM Adhikari to meet families of Kolkata stampede victims on October 20-21

Published

on

West Bengal Chief Minister Suvendu Adhikari on Sunday chaired a high-level meeting at Bhabani Bhawan and announced that he will visit families of those killed in the Durga Puja pandal stampede to hand over compensation cheques on October 20 and 21.

He also informed that personnel from the Kolkata Police, Kolkata Municipal Corporation (KMC), State Fire Services Department have been kept out of the Special Investigation Team (SIT) to probe their role in the stampede. According to him, one out of 19 dead was from Bihar.

“One of the 19 deceased is from Bihar. The process of handing over the bodies has begun. Two of the injured admitted to the ICU have suffered bone fractures, while the remaining 23 are fit for discharge. I will visit the family of every deceased person within two days and personally hand over the compensation cheque,” said CM Adhikari.

He continued, “After an incident like this, the necessary precautions should be taken. This is a large state with a population of 10.5 to 11 crore, and everyone is celebrating the puja festival. We must ensure the safety of others. The lapses have been reviewed. Of the 19 people who died, 18 were residents of West Bengal. For every deceased person, a team comprising a civil administration official, a police administration official and the local MLA will stay with the family until the cremation.”

On the arrangements at the puja pandal, CM Adhikari said, “These are people (civic volunteers) recruited in 2024-25. They (the administration) hire people every year, and this time they were taken from the old list. No new person was brought in. We have asked for the list, and it should be scrutinised. It would not be right to blame them without examining the facts. It started raining, and the rope was released. There were no proper two-lane arrangements there. A temporary passage had been created using ropes, forming a chain. That chain broke, and everyone got mixed up.”

Elaborating on the steps that have been taken so far following the incident, CM Adhikari said, “Seven individuals have been arrested and are currently in police custody under the provisions of the Bharatiya Nyaya Sanhita (BNS). The Governor visited the hospital, as did the Union Home Minister. I am personally monitoring the situation with the assistance of the Chief Secretary, the Commissioner of Police, the Home Secretary, the Director General of Police (DGP), and others. The entire government is actively engaged. We are not celebrating the holiday, nor are we posting anything on social media. We are not making statements to the press assigning blame to others.”

The Chief Minister further said, “An SIT (Special Investigation Team) is also being formed, which will operate under the leadership of a sitting judge. The Chief Secretary will write to the Chief Justice of the Calcutta High Court. If permission is granted, we will constitute the SIT as soon as possible.”

CM Adhikari added that on October 26, during the Bijaya Sammilani event, the government will pay tribute to the 19 people who lost their lives and cheques of Rs 5 lakh each will also be handed over to the families of the 25 injured people at the same event.

The police on Sunday arrested seven people, including organisers, in connection with the stampede at the Chorebagan Sarbojanin Durga Puja Pandal in Kolkata, which claimed 19 lives.

A large number of devotees were injured following a stampede at the Chorebagan Sarbojanin Durga Puja pandal in north Kolkata as an excessive crowd flocked into the pandal arena to catch a glimpse of the idols. Chaos erupted at the Puja pandal after a portion of the exit gate structure collapsed. The injured were immediately rushed to Calcutta Medical College and Hospital and two other state hospitals. About 17 people were declared brought dead at Calcutta Medical College and Hospital, while 25 injured were admitted for treatment. The death toll reached 19 on Sunday.

Continue Reading

disaster

MP: Mild earthquake tremors felt in Singrauli

Published

on

Singrauli, Oct 17: Mild earthquake tremors were felt in the Singrauli district of Madhya Pradesh on Saturday, India Meteorological Department (IMD) officials said.

According to preliminary data, the intensity of the earthquake was measured at 3.5 on the Richter scale.

The epicentre was located at a depth of around 10 km below the surface, officials added.

The tremor was recorded on Saturday at 2:12 p.m.

Officials monitoring seismic activity confirmed that the quake had an intensity of 3.5, with the focus situated around 10 km beneath the earth’s surface.

The information is based on initial readings and remains subject to further verification by scientific agencies.

Residents in parts of Singrauli reported feeling the mild shaking during the afternoon hours.

While the intensity was relatively low, the sudden tremor caused momentary concern among people in the affected areas.

No immediate reports of damage to buildings or injuries have been received so far.

Earthquake monitoring agencies are examining the preliminary data to determine the exact location of the epicentre and assess any aftershock possibilities.

A magnitude of 3.5 is generally classified as a light earthquake, which is often felt by people nearby but rarely causes significant structural damage, especially when the focus is at a moderate depth of around 10 km.

Authorities in Singrauli have advised the public to remain calm and follow standard safety guidelines in case of any further seismic activity.

Local administration is closely tracking the situation and is in coordination with relevant scientific bodies for updated information.

This is not the first time the region has experienced mild seismic activity, though such events of low intensity usually pass without major incident.

Experts note that earthquakes of this magnitude are relatively common in various parts of the country and typically do not pose a serious threat when the depth is around 10 km.

Further details are awaited as agencies continue to analyse the complete data set.

Continue Reading

Business

Nepal, World Bank explore ‘catastrophe bond’ to protect against disaster risks

Published

on

Kathmandu, Oct 15: Nepal and the International Bank for Reconstruction and Development (IBRD), part of the World Bank Group, have signed a mandate agreement to explore the development of a catastrophe bond that could help the Himalayan nation secure rapid access to funds in the event of a major natural disaster.

The agreement marks the beginning of a collaboration to assess the feasibility and potential structure of a catastrophe bond, under which Nepal could transfer part of its disaster risk to international capital markets and strengthen its financial preparedness for natural disasters, the World Bank said in a statement.

Under the agreement, the World Bank Group Treasury will work with the Nepal government and market participants to evaluate the proposed transaction.

The initiative comes as Nepal seeks to strengthen its capacity to prepare for, withstand and recover from natural disasters in the wake of devastating floods in the Bhotekoshi and downstream Trishuli river basins on August 26. The floods have killed nearly 1,500 people, while more than 5,000 remain unaccounted for, according to the National Disaster Risk Reduction and Management Authority.

Triggered by an avalanche near the Nepal-China border that blocked the river’s flow, the floods swept away several human settlements, a dozen hydropower projects, a solar plant, and several roads and bridges. Physical damage is estimated at 1.66 billion US dollars, according to the World Bank’s Global Rapid Post-Disaster Damage Estimation report.

According to the World Bank, Nepal is highly vulnerable to earthquakes, floods, landslides and other climate-related hazards, which can cause extensive damage to infrastructure, disrupt economic activities and place considerable pressure on public finances.

A catastrophe bond is a financial instrument that allows governments or other entities to transfer specific disaster risks to investors. Depending on the terms of the bond, investors may lose some or all of their principal if a specified disaster occurs, allowing the funds to be used to support the affected entity.

“Such instruments can provide an alternative source of disaster financing, potentially enabling governments to access funds more quickly than relying solely on budget reallocations or post-disaster assistance,” the World Bank said.

The initiative is part of the World Bank Group’s established catastrophe bond programme, which has helped countries access international capital markets to transfer disaster risks and secure financial protection against natural hazards.

The World Bank helps countries increase their financial resilience to disasters by supporting disaster risk financing programmes and offering contingent financing and insurance solutions.

It also assists countries in designing, developing and implementing comprehensive disaster risk financing strategies.

“A risk financing strategy helps clients determine a balance between retaining risk, for example, through a contingent financing product, and transferring risk, for example, through an insurance product,” the World Bank said.

A range of financial products can be used to address the financial risks of disasters, and the optimal mix of approaches depends on the types of risks faced by a country and the frequency and severity of disaster events, it said.

Developing countries are particularly vulnerable to the economic and fiscal consequences of disasters because of factors such as gaps in insurance coverage, inadequate infrastructure resilience, and the concentration of populations and economic activities in exposed areas.

“Following a major disaster, governments often have to redirect budgetary resources towards emergency response, relief and reconstruction, potentially affecting other development priorities,” the World Bank said.

Continue Reading

Trending