Connect with us
Thursday,16-July-2026
Breaking News

Maharashtra

Mumbai Rains: City On High Tide Alert; Waves Anticipated To Reach 14 Feet As IMD Predicts Heavy Rainfall

Published

on

Mumbai: The Brihanmumbai Municipal Corporation (BMC) has released a high tide warning for Mumbai from July 24 to July 27, forecasting tide heights exceeding 4.5 meters. The India Meteorological Department (IMD) has issued an orange alert because of anticipated heavy to very heavy rainfall.

The Brihanmumbai Municipal Corporation has announced a high tide alert for Mumbai from July 24 to July 27, expecting tide levels above 4.5 meters. The India Meteorological Department has issued an orange alert for anticipated heavy rainfall, forecasting extreme tides of 4.67 meters on July 26 and 4.60 meters on July 27.

The IMD predicts a predominantly overcast sky with heavy rainfall expected in some parts of Mumbai and nearby areas on July 24, accompanied by strong winds of 40 to 50 km/h, resulting in an orange alert for the city and a red alert for the Konkan region.

Tide Times For Today

on July 25, mostly cloudy skies with a chance of heavy rain. Tides: High at 12:40 PM (4.66 m) and low at 6:46 PM (1.40 m). Residents, especially those in low-lying and coastal regions, are urged to take precautions during high tide times because of potential flooding and waterlogging. Emergency responders are prepared as the city experiences increased monsoon conditions.

Between July 24 and 31, 2025, Mumbai will witness two high and low tides each day. The highest tides will occur at 4.66 meters on July 26th at 1:15 PM, while the lowest will be 3.71 meters on July 28th at 2:34 AM.

Low tides will mainly be under 1.73 meters, reaching a low of -0.3 meters on July 24th at 5:07 AM. The peak low tide will reach 1.73 meters on July 31st at 9:40 AM. Sunrise will transition from 6:13 AM to 6:15 AM, and sunset will vary from 7:14 PM to 7:17 PM.

Maharashtra

FDA conducts major raid on cosmetics store in Jogeshwari, seizes unlabeled toilet soap

Published

on

Mumbai, July 16: A team of Food and Drug Administration (FDA), Greater Mumbai Division conducted a major raid at M/s JK Soap Bazaar, 10/11, Qadir Ismail Estate, Near Momin Colony, Patel Estate Road, Jogeshwari (West), Mumbai – 400102. During the operation conducted on July 14, 2026, it was observed that unlabeled toilet soap was being stored and offered for sale in the establishment. The seized soap lacked statutory information like batch/lot number, date of manufacture, ‘first use’ date, manufacturing license number, and name and address of the manufacturer. Selling cosmetics without such mandatory labelling is a violation of the law. During this operation, toilet soap worth about Rs 10,93,692 was seized, and two samples were collected for analysis as part of the ongoing investigation. The accused in this case is Nabiullah and necessary legal action is being initiated against him. “The Food and Drug Administration gives top priority to the protection of the health of citizens. Making any cosmetic product available for sale in the market without labelling as per the law is a very serious matter. It becomes difficult to verify the source, quality and safety of such products. Therefore, strict legal action will be taken against the violating manufacturers, distributors and sellers.” This warning was given by Takaram Mandhe, Commissioner, Food and Drug Administration, Maharashtra State.

Continue Reading

Maharashtra

AIMIM Govindi corporator’s husband Atiq Khan banished from city for a year, makes emotional appeal to public on social media and apologizes

Published

on

Mumbai: Maharashtra AIMIM leader and husband of a corporator from Govindpura, Atiq Khan, has been banned from the city for one year by the Mumbai Police. In an emotional message on social media, Atiq Khan said that he has been banned from Mumbai city and suburbs for one year, so he will be unable to do pending work or visit the area. If the public or students face educational difficulties due to his absence in the area for one year, he apologizes for it. The police had registered a case against Atiq Khan for violence and rioting, and accordingly, he has been banned, so a complete ban has been imposed on his entry into the area for one year. The ban on this ban will come into effect today. Therefore, Atiq Khan has made a very emotional video and apologized to the public on social media and has also expressed his passion for public service and said that he will continue to serve the public.

Continue Reading

Maharashtra

Major hurdle in completion of expansion project in Mumbai railway network, several projects are facing delays due to encroachment on railway lands, RTI reveals

Published

on

Mumbai: Encroachments on railway land are a major reason for delays in railway projects in Mumbai city. Due to delay in its acquisition, projects have been delayed and their estimates have also increased, this has been revealed in an RTI information filed by RTI activist Anil Gilgali. RTI has revealed that 1,574 encroachments have been identified for two major MRVC rail projects, occupying about 17,000 square meters of land. Information sought by RTI activist Anil Gilgali under the Right to Information (RTI) Act, 2005 has revealed that a total of 1,574 encroachments were identified during the acquisition of land for two major rail projects of the Mumbai Rail Development Corporation (MRDC). Out of these, 998 encroachments have been removed so far, while encroachments were found on about 17,068 square meters of land. According to information provided by MRVC to RTI activist Anil Gilgali on July 14, 2026, this information relates to the Kalyan-Badlapur 3rd and 4th rail line projects and the Airoli-Kola elevated corridor project.

Kalyan-Badlapur 3rd and 4th rail line project
According to MRVC, 706 encroachments were identified during the acquisition of land for the 3rd and 4th railway lines of the Central Railway between Kalyan and Badlapur. These include hutments and other structures located on railway land and newly acquired land. Out of these, 620 encroachments have been removed, while encroachments were found on about 9668 square meters of land. MRVC also said that each encroachment occurred in different years, hence it is not possible to identify a specific year. The encroachments identified for the project are located between Kalyan and Badlapur railway stations.
Airoli – Kalwa Elevated Corridor Project.

During land acquisition for the Airoli – Kalwa Elevated Corridor Project, 868 encroachments were identified. These included constructions on railway land and newly acquired land. So far, 378 encroachments have been removed while about 7400 sq m of land was found to be occupied. These encroachments are located between Digha village and Kalwa station. The MRVC also clarified that all the encroachments occurred in different years.

Information on re-encroachments not available
The RTI application also asked in how many areas encroachments were re-established after the encroachments were removed. The MRVC replied that the relevant information was not available.
Anil Gilgali raised important questions.

RTI activist Anil Gilgali said that encroachments have become a serious challenge in railway projects in Mumbai. Encroachments are a major reason for project delays, cost overruns and additional burden on public funds, he said. Mere removal of encroachments is not enough. Railways and MRVC should ensure that no encroachments are created again in the removed areas. Regular monitoring, safeguards and accountability are essential to achieve this.

Gilgali also demanded that information on land acquisition, encroachments, rehabilitation and progress in removal of encroachments for all rail projects be made available on a public portal from time to time, to enhance transparency and provide real-time information to citizens.

He said that availability of land is very important for Mumbai’s rapidly developing rail network. If encroachments are not effectively controlled, many public transport projects in the future may be affected. Therefore, the government, railways and local administration should come together to find a permanent solution.

Continue Reading

Trending