Connect with us
Wednesday,12-August-2026
Breaking News

Maharashtra

Mumbai Infra News: BMC Plans To Demolish Veer Savarkar Flyover To Improve Coastal Road Phase 2 Connectivity In Goregaon

Published

on

Mumbai: The Brihanmumbai Municipal Corporation (BMC) plans to demolish the Veer Savarkar flyover in Goregaon, built at a cost of Rs 27 crore and opened in 2018. This demolition, occurring just seven years after its inauguration, aims to facilitate a key elevated connector for the Versova-Dahisar stretch of Coastal Road Phase 2.

The Savarkar flyover, also known as the MTNL flyover, served as a crucial east-west traffic link, connecting S.V. Road to New Link Road and significantly reducing congestion in the western suburbs. However, civic officials determined that the flyover obstructs the alignment of the new coastal corridor connecting Mindspace to Dindoshi court.

In place of the existing flyover, a proposed two-tiered flyover will feature an upper deck for the coastal road and a lower deck reconfiguring the Savarkar flyover. A formal proposal for this construction is being prepared for municipal commissioner approval.

The demolition could disrupt commuters, as the flyover has greatly shortened travel times for those heading to areas like Malad, Madh, and Marve. Residents express concerns about potential traffic bottlenecks and dust pollution during the project. This segment, part of the broader Mumbai Coastal Road Project Phase 2, extends roughly 22.9 km and includes various infrastructure features, enhancing connectivity in the region.

Mumbai’s infrastructure projects, including the Goregaon-Mulund Link Road (GMLR) and Madh-Versova bridge, are straining the understaffed BMC’s Bridges Department. To mitigate this, the BMC plans to deploy 200 additional officers for the Versova-Dahisar Link Road (VDLR) project, pending approval from Municipal Commissioner Bhushan Gagrani.

The BMC is also expediting Phase II of the Mumbai Coastal Road Project (MCRP) following state directives; the VDLR, at Rs 16,621 crore, aims to alleviate traffic congestion. An elevated Dahisar-Bhayandar road will cost Rs 3,304 crore, starting work in August 2025. Phase II will include tunnels and a cable-stayed bridge, enhancing connectivity, with construction commencing in September.

Maharashtra

Mumbai : There is no solution to the problem of landslides in the last 15 years, 22,483 families live in dangerous areas in the city and suburbs

Published

on

Mumbai: Hill collapses are not new to Mumbai, but the state government has failed to take serious steps to address the problem in the last 15 years. In the last 34 years, 340 people have lost their lives and over 300 have been injured in landslides.

In 25 of Mumbai’s 36 assembly constituencies, 257 places in hilly areas have been classified as dangerous. RTI activist Anil Gilgali said that the Mumbai Slum Improvement Board had recommended the relocation of 9,657 out of 22,483 identified slums on priority basis. It had also proposed to make the remaining slums safe by building protective walls around the hills. Gilgali had earlier warned the Maharashtra government about the risk of landslides at 327 places during the monsoon season.

Between 1992 and 2026, 340 people died and over 300 were injured in landslides. The Mumbai Slum Improvement Board had recommended relocation. A comprehensive survey was conducted in 2010. If action had been taken then, the deaths of the residents of these hilly areas could have been prevented. Following the board’s report and Anil Gilgali’s correspondence, the then Chief Minister Prithviraj Chavan ordered the Urban Development Department to prepare an action plan on September 1, 2011. However, 15 years have passed since then, and the Urban Development Department is yet to start working on it. In other words, no one has prepared an ‘Action Taken Plan’ (ATP) as directed by the Chief Minister,

Continue Reading

Maharashtra

Robbery in Mumbai Saki Naka, 4 arrested, stolen goods recovered

Published

on

Mumbai: The Sakinaka police have claimed to have solved the mystery of the robbery at the junk shop of the complainant, Mohammed Hussain Abdul Karim, and arrested the accused. 22 kg of silver and cash worth a total of Rs 44 lakh were stolen from the junk shop. The shop was located in Anise Compound. The police had registered a complaint regarding this. On this basis, the Mumbai Police’s detection team tracked down the thieves and arrested four accused and claimed to have seized silver worth Rs 44 lakh and a mobile phone. The accused have been identified as Maqsood Shah, 20, a resident of Sakinaka in Mumbai, Uttar Pradesh, Zeeshan Abdul Subhan, 20, a resident of Mumbra, Daighar, Akhbar Hussain Ghulam Murtaza, 27, Mumbra, and Irfan Noorullah Khan, 26, Siddharth Nagar, UP. The four accused have been arrested and the stolen goods have been recovered. This operation was carried out by DCP Dutta Nalawade on the instructions of Mumbai Police Commissioner Deven Bharti.

Continue Reading

Maharashtra

37 unauthorized shops removed from footpaths in Vakola area, action taken by BMC ‘H East’ ward under ‘Pedestrian First’ campaign

Published

on

Mumbai: The Mumbai Municipal Corporation (BMC) is implementing the ‘Pedestrian First’ campaign to ensure that pedestrians can walk on the footpaths with ease. As part of this initiative, action was taken to remove 37 unauthorised shops obstructing the footpaths along Rajendra Kamble Marg in Vakola area yesterday (August 11, 2026). The operation was carried out by the ‘H East’ ward of BMC. As per the directions of the High Court and under the guidance of Municipal Commissioner Ashwini Bhide. BMC is effectively implementing the ‘Pedestrian First’ campaign to clear the footpaths of unauthorised hawkers and encroachments, thus making them free from obstructions. In this backdrop, the footpaths along Rajendra Kamble Marg in Vakola were cleared during an operation led by Assistant Commissioner (H East Ward) Smt. Mr. Mridula Ande, Deputy Commissioner (Zone-3) under the guidance of Shri Vishwas Mote. During this drive, 37 unauthorized shops erected on footpaths were removed, and materials obstructing the walkways were seized.

The operation was carried out with the support of about 31 officers and staff members using 4 vehicles, 2 dumpers, 1 JCB and other machinery. Adequate police security was deployed during the drive.
Meanwhile, the Municipal Corporation continues to implement measures to ensure the availability of accessible footpaths for pedestrians. Therefore, unauthorized constructions or placement of materials obstructing footpaths are prohibited. The Municipal Corporation administration has said that strict action will be taken if such incidents are found.

Continue Reading

Trending