Connect with us
Wednesday,12-February-2025
Breaking News

Maharashtra

‘Baseless, False’: Shrikant Shinde Refutes ‘Rumours’ Of Him Becoming Maharashtra Deputy CM

Published

on

As the Mahayuti is yet to declare the Chief Minister face of Maharashtra, Shiv Sena MP from Kalyan, Shrikant Shinde on Monday refuted the “rumours” of him becoming the Deputy CM of Maharashtra and said that he is not in the race for any ministerial position in the state.

“After elections results, formation of government is delayed a little and that is why so many rumours are floating around and one is that I am going to be the deputy chief minister in the new government. I want to tell everyone that this is completely baseless and false, there is no fact in this. I had already a chance to become a minister in the Union Cabinet after Lok Sabha elections, but I chose to work for my party organisation and it is still like that, I have no desire for a position in power,” Shrikant Shinde posted on X.

He further said that he is not in the race for any ministerial position in the state, adding that he is willing to work for his Lok Sabha constituency and Shiv Sena.

“I can understand the enthusiasm and competition of News media but at the same time, they should not turn their back on the facts. I hope that rumours about me. Will stop now,” he added.

The results of the General Elections to the Maharashtra Legislative Assembly were declared on Saturday, November 23. In these elections, Mahayuti secured 230 of the 288 seats in the state assembly. However, the alliance has yet to finalize its Chief Ministerial candidate.

The BJP won 132 seats, while its allies — the Shiv Sena, led by Chief Minister Eknath Shinde, secured 57 seats, and the NCP, led by Deputy Chief Minister Ajit Pawar, won 41 seats.

In contrast, the Maha Vikas Aghadi (MVA) suffered a major setback. The Shiv Sena (UBT), led by Uddhav Thackeray, won only 20 seats, Congress secured 16, and the NCP(SP), led by Sharad Pawar, managed just 10 seats.

Maharashtra

Good News For Mumbaikars! New Jogeshwari Terminus Nears Completion, Operations Likely To Begin In Next 6 Months

Published

on

Mumbai: The upcoming rail terminus at Jogeshwari, located between Ram Mandir and Jogeshwari stations on the eastern side, is expected to be operational within the next six months. The facility, built on land that previously housed a railway-operated cement warehouse, is projected to remarkably reduce congestion at existing terminuses in Dadar, Bandra and Mumbai Central by increasing train services.

Western Railway (WR) officials confirmed that the Rs 69 crore project, under construction for nearly two years, is progressing steadily. Contractors have been directed to expedite the work, with a target of completing 70-75% of the project by the end of March.

Several key milestones have already been achieved, including the completion of a labour shed. Work on essential components such as the cover shed, service building, platform and station building is ongoing, while track-laying has commenced.

“The construction at Jogeshwari Terminus is moving at a good pace. The island platforms are nearly complete, and we expect the majority of civil work to be finished by summer. The progress of island platforms and associated infrastructure is visible on-site,” said a senior Western Railway official.

An island platform, which allows trains to arrive on tracks on either side, is an efficient space-saving design. The terminus at Jogeshwari will feature a 600-meter-long and 12-meter-wide island platform, capable of handling 24-coach trains. Additionally, the facility will include two berthing lines and a Power Run Down (PRD) line to facilitate shunting operations. A coach watering facility will also be available.

With Mumbai’s growing commuter base, the Jogeshwari Terminus is expected to provide much-needed relief, streamlining operations and improving connectivity for long-distance travellers.

Continue Reading

Bollywood

India’s Got Latent Controversy: Mumbai Police Summons Ranveer Allahbadia & Samay Raina Over ‘Vulgar’ Remarks During Show

Published

on

Mumbai: The Mumbai police are conducting a preliminary inquiry into digital content creators Ranveer Allahbadia and Samay Raina, who host India’s Got Latent. On Tuesday, the police sent a summons to both of them. A police team arrived at Allahbadia’s residence, located near Seven Bungalows, Andheri West, at Bay View Building, and will be questioning him and Raina there. The police are investigating a controversial video clip. In India’s Got Latent, Allahbadia made a comment that created outrage and was alleged to be vulgar and obscene. The comment faced criticism from various platforms, including political, social, legal, and women’s rights organisations.

Earlier today, a team of Mumbai Police reached Ranveer Allahbadia’s house in the city’s Versova area.

According to reports, the Parliamentary IT Panel is mulling over whether to summon Allahbadia following Shiv Sena UBT Rajya Sabha MP Priyanka Chaturvedi’s statement on Monday, in which she stated that she would raise the issue before the Panel.

After the backlash, Ranveer issued an apology and called it a ‘lapse in judgment.’ He said, “My comment wasn’t just inappropriate; it wasn’t even funny. Comedy is not my forte. I am just here. Many of you asked if this is how I wish to use my platform and obviously, this is not how I wish to use it. I am not going to give any context or justification or reasoning behind whatever happened. I am just here to apologise.”

Continue Reading

disaster

Massive Fire Breaks Out At Oshiwara Furniture Market In Jogeshwari, No Injuries Reported; Visuals Surface

Published

on

Mumbai: A massive fire broke out at a furniture godown in Oshiwara Furniture Market in Jogeshwari West, on Tuesday morning. The Mumbai Fire Brigade (MFB) reported the incident at 11:52 am, classifying it as a Level-II fire at 11:46 am. No injuries were reported in the incident.

Details On The Fire Incident

The fire erupted in a ground-floor furniture godown near A1 Darbar Restaurant on Swami Vivekanand Marg. Thick smoke and flames were seen rising from the structure, causing panic in the area. Firefighters and other emergency services rushed to the spot to contain the blaze.

Authorities quickly mobilised multiple agencies, including the Mumbai Fire Brigade, police, Adani electricity officials, ward staff and 108 ambulance services. Fortunately, no injuries have been reported so far.

Cause Of Fire Not Known Yet

Firefighting operations were underway to prevent the fire from spreading to nearby structures, with efforts focused on controlling the flames and ensuring the safety of surrounding areas. The cause of the fire remains unknown and further investigation will be conducted to determine the exact reason behind the incident.

Continue Reading

Trending