Maharashtra
Mumbai: Mill Workers’ Homes To Come In Thane, CM Eknath Shinde Promises

The Maharashtra government has identified 43,000 hectares of land at five locations in Thane district to provide more homes to mill workers. The key distribution programme was held on Friday as part of the second phase of home allotment.
Shinde said, “The pace of giving possession of houses to eligible mill workers will be maintained. To avoid delay in getting housing, key distribution programmes will also be conducted as soon as the eligibility is determined. Houses are being made available at affordable rates to common people through various schemes like the Pradhan Mantri Awas Yojana and Modi Awas Yojana.”
Houses are being made available through PM Schemes
Deputy Chief Minister Devendra Fadnavis said that a monitoring committee has been appointed to ensure that mill workers get their rightful houses at an early stage.
Fadnavis said, “The possession of the houses will be given regularly every week after determining the eligibility of the workers and their heirs, the process for which has been expedited. The repair work of the flats constructed by MMRDA at Mauje Kon (Panvel) is underway and the process of handing over the houses will be started soon after the repairs are completed.”
Fadnavis said a report has been sought from the Collector to explore construction of buildings at the locations.
Maharashtra
Mumbai: BEST Employees Receive ₹31,000 Diwali Bonus Credited Ahead Of Festival, Bringing Festive Cheer To 23,596 Staff

Mumbai: Bringing festive cheer ahead of Diwali, the Brihanmumbai Electric Supply and Transport (BEST) undertaking has announced an ‘ Bonus ‘of Rs 31,000 (Rupees Thirty-One Thousand Only) to each of its 23,596 officers and employees. The bonus amount was credited directly into their bank accounts on Friday, October 17, 2025 (Vasu Baras), much to the delight of the workforce.
This year’s ex-gratia amount marks an increase compared to last year, and has created a wave of happiness among the employees. The timely credit of the Diwali bonus ahead of the festival has given employees the financial boost to make festive purchases on the occasion of Dhanteras.
BEST Workers Union office-bearers met with the newly appointed General Manager of BEST, Dr. Sonia Sethi recently, at the BEST Bhavan in Colaba. During the meeting, discussions were held regarding long-standing demands of the employees, including the Diwali ex-gratia. Dr. Sethi assured the union representatives that BEST employees would receive a Diwali bonus on par with their counterparts in the Brihanmumbai Municipal Corporation (BMC).
Maharashtra
Mumbai Metro Line-3 (Aqua Line) Fully Operational — A New Era of Urban Connectivity Begins

Mumbai, October 2025:
Mumbai has taken a major leap in public transportation with the full launch of the Mumbai Metro Line-3 (Aqua Line) — the city’s first underground metro corridor. Connecting the northern suburbs to South Mumbai, the 33.5-kilometre line aims to transform the way Mumbaikars commute, offering a fast, clean, and comfortable alternative to road and rail congestion.
Route and Connectivity
The Aqua Line runs from Aarey / JVLR in the north to Cuffe Parade in the south, covering 27 underground stations. The line passes through key business and residential areas such as Bandra Kurla Complex (BKC), Dharavi, Siddhivinayak, Worli, Churchgate, CSMT, and Nariman Point.
One of its biggest highlights is direct connectivity to both terminals of Mumbai’s airport — the Domestic and International terminals — making airport travel smoother than ever before.
The entire north–south journey can now be completed in about 45 minutes, a major improvement over the two-hour average by road during peak traffic.
Station Highlights
Some of the prominent stations on the Aqua Line include:
Aarey / JVLR, Seepz, MIDC, Marol Naka, Airport Terminal 1, Airport Terminal 2, BKC, Dharavi, Siddhivinayak, Worli, Haji Ali, Churchgate, and Cuffe Parade.
Each station features modern facilities such as escalators, elevators, digital information screens, and air-conditioned platforms. Entry and exit points are designed for smooth passenger movement, including dedicated access for persons with disabilities.
Technology and Features
- Fully underground corridor, ensuring minimal impact on road traffic.
- 8-coach trains with advanced safety systems and automatic doors.
- Platform screen doors at major stations for enhanced safety.
- Real-time passenger information systems inside trains and stations.
- CCTV surveillance, emergency communication systems, and modern fire safety equipment.
- Energy-efficient operations, regenerative braking, and noise reduction design.
- Seamless ticketing system* with QR code tickets, smart cards, and mobile app payments.
Fares and Timings
The fare structure has been designed to stay affordable and distance-based:
Distance (in km) | Fare (₹) |
---|---|
0 – 3 km | 10 |
3 – 12 km | 20 |
12 – 18 km | 30 |
18 – 24 km | 40 |
24 – 30 km | 50 |
30 – 36 km | 60 |
36 – 42 km | 70 |
Beyond 42 km | 80 |
Metro services operate from 5:55 AM to 10:30 PM, with trains running every few minutes during peak hours to ensure minimal waiting time.
Benefits for the City
- Time Saving: Travel from the northern suburbs to South Mumbai in less than an hour.
- Reduced Traffic: Expected to ease road congestion and lessen dependence on private vehicles.
- Environmental Impact: Cleaner, electric transit reduces carbon emissions.
- Economic Growth: Improved access to commercial hubs like BKC, Fort, and Nariman Point will support business and real estate growth.
- Passenger Comfort: Air-conditioned coaches, smooth rides, and high safety standards enhance the commuting experience.
A Step Toward a Smarter Mumbai
With Metro Line-3 now fully operational, Mumbai moves closer to a truly integrated transport network, connecting its suburban rail, metro, and bus systems. The Aqua Line is more than just a transport project — it’s a symbol of progress, promising faster, greener, and more efficient mobility for millions of daily commuters.
Maharashtra
Mumbai Police Commissioner Deven Bharti public darbar on October 21 postponed due to Diwali

Mumbai Police Commissioner’s Janta Awami Darbar will not be held in the backdrop of Diwali. Please note that due to the Diwali festival, Tuesday’s meeting with Mumbaikars has been postponed to October 21, 2025.
Citizens are requested to meet the Police Commissioner on Tuesday, October 28, 2025 at 3:30 PM with their complaints and suggestions.
No prior permission is required for this. This message has been shared by Mumbai Police Commissioner Deven Bharti on X.
-
Crime3 years ago
Class 10 student jumps to death in Jaipur
-
Maharashtra1 year ago
Mumbai Local Train Update: Central Railway’s New Timetable Comes Into Effect; Check Full List Of Revised Timings & Stations
-
Maharashtra1 year ago
Mumbai To Go Toll-Free Tonight! Maharashtra Govt Announces Complete Toll Waiver For Light Motor Vehicles At All 5 Entry Points Of City
-
Maharashtra1 year ago
False photo of Imtiaz Jaleel’s rally, exposing the fooling conspiracy
-
National News1 year ago
Ministry of Railways rolls out Special Drive 4.0 with focus on digitisation, cleanliness, inclusiveness and grievance redressal
-
Maharashtra11 months ago
Maharashtra Elections 2024: Mumbai Metro & BEST Services Extended Till Midnight On Voting Day
-
National News1 year ago
J&K: 4 Jawans Killed, 28 Injured After Bus Carrying BSF Personnel For Poll Duty Falls Into Gorge In Budgam; Terrifying Visuals Surface
-
Crime1 year ago
Baba Siddique Murder: Mumbai Police Unable To Get Lawrence Bishnoi Custody Due To Home Ministry Order, Says Report