Connect with us
Friday,18-October-2024
Breaking News

Tech

Airtel deploys India’s 1st private 5G network amid heated industry debate

Published

on

 Amid the heated debate on allowing enterprises to build captive private 5G networks as India prepares for 5G spectrum auction, Bharti Airtel on Friday announced a successful trial of India’s first 5G private network at Bosch Automotive Electronics India (RBAI) facility here.

The on-premise 5G Captive Private Network was built over the trial 5G spectrum allocated by the Department of Telecom (DoT).

Airtel said it has implemented two industrial grade use cases for quality improvement and operational efficiency at Bosch’s manufacturing facility, utilising the trial spectrum.

In both the cases, 5G technology such as mobile broadband and ultra reliable low latency communications drove automated operations ensuring faster scale up and reduced downtimes.

“We believe that Airtel has the world-class infrastructure, partnerships and expertise to deliver Captive Private Network Solution in any part of the country and to enterprises of any size,” said Ajay Chitkara, Director and CEO, Airtel Business.

The Department of Telecom has released a notice inviting applications (NIA) for the auction of spectrum in 600, 700, 800, 900, 1800, 2100, 2300, 2500, 3300 MHz and 26GHz bands.

The NIA provides explicit clarity on the subject of Captive Non-Public Networks (CNPN).

The private network set up on trial spectrum at the Bosch facility has the capability to manage thousands of connected devices along with delivering multi- GBPS throughput, said Airtel.

“The low latency and reliable connectivity provided by the Airtel Private 5G network at our facility which was experienced during the proof of concept is enabling us to enhance our efficiency and our productivity,” said Subhash P., Head of Technical Functions, Bosch Automotive Electronics India.

Last year, Airtel successfully demonstrated India’s first 5G experience over a live 4G network in Hyderabad. It has also demonstrated India’s first rural 5G trial as well as the first cloud gaming experience on 5G.

Meanwhile, the Broadband India Forum (BIF) on Friday said the choice of service provider for captive private 5G networks must lie with the enterprises.

“The enterprises would have to make do with whatever is offered by the telecom service providers (TSPs), whether satisfactory or not,” said BIF President T.V. Ramachandran.

The Cellular Operators Association of India (COAI), the industry’s apex body representing telcos, on Thursday urged the government not to allow Big Tech companies to enter the 5G spectrum auction this month via back door channels.

The COAI said in a statement that the 5G spectrum should not be provided on an administrative basis as it leads to no business case for the rollout of 5G networks in the country.

Tech

Huawei launches world’s first smartphone with triple foldable display, here’s how much it costs

Published

on

Companies have been teasing its tri-fold smartphone design for a while now. However, Huawei has managed to beat everyone to the race by launching the world’s first foldable smartphone with triple foldable display. Dubbed Mate XT, the smartphone features a 10.2-inch display that can fold three times to fit in a regular phone-like form factor.

How much the phone costs

Huawei has launched the phone in China at 19999 yuan or $2800 which roughly translates to Rs 2,35,000. The phone comes in two other configurations – 16GB + 512GB and 16GB + 1TB that are priced at 21999 yuan and 23999 yuan respectively.

The phone has launched only in China and will start shipping starting September 20.

Huawei Mate XT: Features

The Huawei Mate XT features a 10.3-inch foldable OLED display, providing a large screen area when fully unfolded. It is powered by a 5600mAh battery with support for 66-watt fast charging.

The smartphone comes with a triple-camera setup, including a 50-megapixel main camera, a 12-megapixel ultrawide lens, and a 12-megapixel periscope lens, offering 5.5x optical zoom.

The triple-foldable design allows the device to fold into a Z-shape using two hinges, creating three distinct display areas. Users can partially unfold the screen.

Continue Reading

National News

Passport Seva Portal To Be Shut From Today: Technical Maintenance Work From August 29-September 2, All Appointments Rescheduled

Published

on

Individuals gearing up to travel and perhaps even relocate will have to wait for some days, as the Passport Seva Portal, India’s official website processing passport-related exercises, will be down from August 29 to September 2.

According to the website, the portal, “Passport Seva portal will be down for technical maintenance from 29th August 2024, Thursday 20:00 hrs IST to 2nd September, Monday 06:00 hrs IST.”

The pop notification on the government website said, “System will not be available during this period for citizens and for all MEA/RPO/BOI/ISP/DoP/Police Authorities. The already booked appointments for 30th August 2024 will be suitably rescheduled and informed to applicants.”

This therefore would mean that all the existing appointments will in all probability be rescheduled.

The Passport Seva Portal X account posted the notifications on August 25. It also reposted posts from Regional Passport Offices.

According to the External Affairs Ministry, “The External Affairs Ministry said this is a routine procedure. “For rescheduling of appointments, we always have contingency plans. The maintenance activity for a public centric service (like Passport Seva Kendras) is always planned in advance so that no inconvenience is meted out to public. So rescheduling an appointment will not be a challenge,” a source from the ministry has said.”

Continue Reading

Tech

Gaganyaan Mission: ISRO To Send Half-Humanoid Female Robot ‘Vyommitra’ Into Space Ahead Of Manned Project

Published

on

By

Lately, Dr Jitendra Singh, Union Science & Technology Minister, asserted that India will soon launch Vyommitra, a half-humanoid female robot astronaut, to space ahead of its much delayed Gaganyaan missions. ISRO plans to launch two unmanned missions carrying a humanoid robot ‘Vyommitra’ ahead of the final human-crewed mission, which is anticipated in 2024 or 2025.

Dr Singh said that India’s space sector is on a rapid growth trajectory, with the country’s space economy, currently valued at $8 billion, expected to reach an incredible $40 billion by 2040.

his prediction fits with international observers’ even more promising potential of $100 billion. The Minister highlighted the significant progress in attracting private investment to space entrepreneurs, which have raised more than Rs 1,000 crore since April of this fiscal year.

According to the Minister, the exponential surge in the number of space companies in India is due to PM Narendra Modi’s policies. Starting from one startup in 2014, India now has 190, with some already transforming into viable businesses. This surge in the space sector entrepreneurial activity represents the government’s commitment to encouraging innovation and private participation.

Through satellite launches, ISRO generated foreign cash. India’s space agency until now has launched over 430 foreign satellites, earning over 290 million Euros from European satellites and over 170 million US Dollars from American satellites.

The historic Chandrayaan 3 mission discovered water molecules on the moon’s surface, a feat that had eluded even previous expeditions from the United States and the Soviet Union.

The Minister highlighted that India’s space technology is more than only exploration; it is also about practical applications that impact people’s everyday lives. It is crucial in multiple sectors, including disaster management, infrastructure development, agriculture, telemedicine, and robotic surgery.

Continue Reading
Advertisement
Advertisement

Trending